|
|
イシイ ノブアキ
Ishii Nobuaki 石井 信明 所属 神奈川大学 工学部 経営工学科 神奈川大学大学院 工学研究科 工学専攻(経営工学領域) 職種 教授 |
|
言語種別 | 英語 |
発行・発表の年月 | 2017/07 |
形態種別 | その他論文 |
査読 | 査読あり |
標題 | Resource Flow based Order Selection Method in Project Cost Estimation Process |
執筆形態 | 共著 |
掲載誌名 | Proceedings of SIMULTECH 2017 |
掲載区分 | 国外 |
出版社・発行元 | INSTICC - Institute for Systems and Technologies of Information, Control and Communication |
巻・号・頁 | pp.155-162 |
著者・共著者 | Ishii,N., Takano, Y. and Muraki, M. |
概要 | In this study, a multistage project cost estimation process model, consisting of pre-evaluation, order selection, man-hour allocation, and a series of cost estimation steps, is developed. Then, this study devises a resource flow based order selection method and man-hour allocation method to provide successful results to clients and to maximize the contractor's profits under the limited resources. Specifically, those methods dynamically select orders to estimate cost at each order arrival and allocate the resources to the selected orders, respectively. The effectiveness of our method is demonstrated through simulation experiments using the developed model. |
DOI | 10.5220/0006481901550162 |
ISBN | 978-989-758-265-3 |