|
|
イシイ ノブアキ
Ishii Nobuaki 石井 信明 所属 神奈川大学 工学部 経営工学科 神奈川大学大学院 工学研究科 工学専攻(経営工学領域) 職種 教授 |
|
言語種別 | 英語 |
発行・発表の年月 | 2014/10 |
形態種別 | その他論文 |
査読 | 査読あり |
標題 | A method of operational planning for project-based production in consideration of learning effects and demand uncertainty |
執筆形態 | 共著 |
掲載誌名 | Proceedings of the Asia Pacific Industrial Engineering & Management Systems Conference 2014 |
掲載区分 | 国外 |
巻・号・頁 | pp.1208-1212 |
著者・共著者 | Suzuki, Y., Ishii, N., and Muraki, M. |
概要 | In this study, we analyze the characteristics of the project-based production under the learning effects of the temporary workers and demand uncertainty. Then, we develop an operational planning method which determines the production plan and the employment plan of temporary workers in consideration of the learning effects according to the amount of production so as to respond to the demand changes effectively. We explain the developed method in detail, and demonstrate the effectiveness of the developed method by applying it to the home use air conditioning equipment production. |