1.
|
Book
|
A Design Method of the Joint Venture Formation in EPC Projects
(Collaboration)
2022/06
|
2.
|
Book
|
Crack Detection on Brick Walls by Convolutional Neural Networks Using the Methods of Sub-dataset Generation and Matching
(Collaboration)
2003/07
|
3.
|
Papers
|
Digital Twin Opening up Manufacturing DX: Issues and Expectations
(Single)
2023/07
|
4.
|
Papers
|
Quantitative evaluation of an information network in a supply chain
(Collaboration)
2023/05
|
5.
|
Papers
|
Performance Evaluation of CNN-based Crack Detection for Maintenance Targets using Crack Cropping Method
(Collaboration)
2022/10
|
6.
|
Papers
|
A Method for Setting Project Cost Targets in Consideration of the Reliability of Cost Estimation Accuracy
(Single)
2022/07
|
7.
|
Papers
|
Image augmentation with labeling using crack cropping for training dataset generation in crack detection
(Collaboration)
2022/02
|
8.
|
Papers
|
A Bidder Selection Problem in Capital Investment Projects
(Single)
2021/10
|
9.
|
Papers
|
Sub-dataset Generation and Matching for Crack Detection on Brick Walls using Convolutional Neural Networks,
(Collaboration)
2021/07
|
10.
|
Papers
|
Crack detection in concrete structures under varied environmental conditions using CNN
(Collaboration)
2021/04
|
11.
|
Papers
|
Concept of Quantitative Evaluation of Project Management under Uncertainty
(Collaboration)
2021/03
|
12.
|
Papers
|
Using Modeling and Simulation for the Research of Enterprise Robot
(Collaboration)
2021/03
|
13.
|
Papers
|
Design and Evaluation of Project Organization based on Communication Links
(Collaboration)
2019/12
|
14.
|
Papers
|
Project Management Support Using the Log Data of Inter-organizational Communication
(Collaboration)
2019/12
|
15.
|
Papers
|
A Method of Collaborative Inspection Planning by Integrating a Production Planning System
(Collaboration)
2019
|
16.
|
Papers
|
A Method of Supply Chain Evaluation Based on the Structure of an
Information Network
(Collaboration)
2019
|
17.
|
Papers
|
A resource flow based multistage dynamic scheduling method for the state-dependent work
(Collaboration)
2018/12
|
18.
|
Papers
|
Design and Evaluation of the Joint Venture Formation in EPC Projects
(Collaboration)
2018/12
|
19.
|
Papers
|
A supply chain analysis and design method based on the value of information
(Collaboration)
2018/07
|
20.
|
Papers
|
Determining bid markup and resources allocated to cost estimation in competitive bidding
(Collaboration)
2018/01
|
21.
|
Papers
|
A Simulation-Based Dynamic Scheduling Method in Project Cost Estimation Process
(Collaboration)
2017/10
|
22.
|
Papers
|
Artifacts Formulation & Realization: Matsui's Matrix Method, Riccati Equation and Enterprise Robot
(Collaboration)
2017/07
|
23.
|
Papers
|
Resource Flow based Order Selection Method in Project Cost Estimation Process
(Collaboration)
2017/07
|
24.
|
Papers
|
Multi-period resource allocation for estimating project costs in competitive bidding
(Collaboration)
2017/04
|
25.
|
Papers
|
A dynamic scheduling problem in cost estimation process of EPC projects
(Collaboration)
2016/07
|
26.
|
Papers
|
A revised algorithm for competitive bidding price decision under limited engineering Man-Hours in EPC projects
(Collaboration)
2016/04
|
27.
|
Papers
|
Operational planning for project-based production in consideration of worker's learning effects
(Collaboration)
2015/12
|
28.
|
Papers
|
A heuristic bidding price decision algorithm based on cost estimation accuracy under limited engineering man-hours in EPC projects
(Collaboration)
2015
|
29.
|
Papers
|
Method of constructing risk management guides considering crisis state based on progress situation
(Collaboration)
2014/11
|
30.
|
Papers
|
A lot size-based collaborative Demand-to-Supply management system for Make-to-Order environment
(Collaboration)
2014/10
|
31.
|
Papers
|
A method of operational planning for project-based production in consideration of learning effects and demand uncertainty
(Collaboration)
2014/10
|
32.
|
Papers
|
An order acceptance strategy under limited engineering man-hours for cost estimation in Engineering-Procurement-Construction projects
(Collaboration)
2014/04
|
33.
|
Papers
|
A sequential competitive bidding strategy considering inaccurate cost estimates
(Collaboration)
2014/01
|
34.
|
Papers
|
System function evaluation through quality function deployment
(Collaboration)
2013/11
|
35.
|
Papers
|
A Capacity Planning Method for the Demand-to-Supply Management in the Pharmaceutical Industry
(Collaboration)
2013/07
|
36.
|
Papers
|
A two-step bidding price decision algorithm under limited man-hours in EPC projects
(Collaboration)
2013/07
|
37.
|
Papers
|
Case study of generalized material flow cost accounting in consideration of a rate of utilization
(Collaboration)
2013/06
|
38.
|
Papers
|
Software development size estimating method based on importance degree of customer requirements
(Collaboration)
2012/10
|
39.
|
Papers
|
Communication-centered project management for requirements definition phase
(Collaboration)
2012/03
|
40.
|
Papers
|
Analysis method for extraction and adjustment of customer demand
(Collaboration)
2011/12
|
41.
|
Papers
|
A design of practicing education system with ERP
(Collaboration)
2011/10
|
42.
|
Papers
|
Communication-centered project management for requirements definition phase
(Collaboration)
2011/10
|
43.
|
Papers
|
A strategy for accepting orders in ETO manufacturing with competitive bidding
(Collaboration)
2011/07
|
44.
|
Papers
|
Introductory traffic accounting practice for advanced management and a case study
(Collaboration)
2010/12
|
45.
|
Papers
|
Evaluation of RFP using text mining
(Collaboration)
2010/10
|
46.
|
Papers
|
A Theory and Tools for Collaborative Demand-to-Supply Management in the SCM Age
(Collaboration)
2009/05
|
47.
|
Papers
|
A theory and tools for collaborative demand-to-supply management in the SCM age
(Collaboration)
2008/12
|
48.
|
Papers
|
A project management framework at the system requirements definition phase
(Single)
2006/09
|
49.
|
Papers
|
A heuristic procedure for planning flexible production systems for competitive supply chains
(Single)
2004/11
|
50.
|
Papers
|
A framework for simulation-optimization software
(Collaboration)
2003
|
51.
|
Papers
|
Life cycle oriented process synthesis at conceptual planning phase
(Collaboration)
1997/05
|
52.
|
Papers
|
A generic framework for on-line scheduling and control system in batch process management
(Collaboration)
1997
|
53.
|
Papers
|
An extended dispatching rule approach in on-line scheduling framework for batch process management
(Collaboration)
1996
|
54.
|
Papers
|
A process-variability-based online scheduling system in multiproduct batch process
(Collaboration)
1996
|
55.
|
Papers
|
A mixed dispatching rule approach in FMS scheduling
(Collaboration)
1994
|
56.
|
Papers
|
A transient-based real-time scheduling algorithm in FMS
(Collaboration)
1991
|
5 display
|
All display(56)
|